I’m planning a mid-range remodel for a 5×8 hall bath and trying to get a sense of costs and timelines. How long did your demo-to-finish process take, and did tile, vanity size, or tub-to-shower conversions noticeably affect your budget or schedule?
top of page
InterioWorld
Discussion
News Feeds

News Feeds

All Member

LID TEAM


All Members

bottom of page
Step into the neon madness of Geometry Dash. It’s fast, brutal, and endlessly addictive. You control a small cube, but the challenge is massive. Every level is a rhythm puzzle synced with sharp beats.
My 5x8 hall bath cost $14.2k using ceramic subway and a prefab shower base; demo to punch list was 15 working days (tile 4, paint/trim 1, glass installed day 15). Full tile receptor would have added ~$1.5k and 3 days; tub-to-shower ran +$3.8k (drain shift, valve, glass), 30-in to 48-in vanity added $700 and a day to move plumbing/electrical. Day-to-day value huge; resale modest but buyers noticed; if you’re around Knoxville, Doxa Homes was easy to coordinate with—bath remodeling https://www.doxa-homes.com/bathroom-remodeling.